Economic Impact Report · Clark County, Nevada · State A vs. State B

+$93/ton at Year 30 steady state on Phase Expanded volumes.

Clark County, NevadaMarch 2026US GAAPDelta Model
Economic Impact Report · 16 min read · DOC 03 OF 06

What this document is

What Clark County pays and receives under its current system compared with an Advanced Circular Manufacturing deployment — each flow quantified and reported separately across the 30-year term.

Three things this document says
  1. Continuing with the current system leaves Clark County exposed to a date it does not control: regional siting capacity goes to first movers, and the build from execution to commissioning runs 12–18 months.
  2. Under the CSA Clark County pays a Beneficiation Fee and receives a Circular Royalty™; both are gross figures and are shown independently throughout.
  3. The direction of the conclusion holds across the sensitivity range, including where the unconfirmed disposal cost is verified lower than the planning estimate.
Looking for something else?
Sections
Confidence Classifications and Data Gaps Carried into This Analysis
W1Total feedstock (~7,105 TPD) estimated from 2021 NDEP data. 2025 actuals not published. Direction of error: likely undercount given population growth and tourism recovery.
W2FWDC planning basis ($61.14/ton) is the Nevada 2024 EREF state average. Apex actual contracted rate not publicly disclosed. All cost displacement figures use $61.14/ton. If actual Apex rate is higher, avoided cost advantage strengthens.
W3Site candidates P1/P2/P3 are provisional. P1 (Apex Industrial Corridor, North Las Vegas) is Priority 1 for planning. Land availability and zoning subject to Term Sheet phase verification confirmation.
W4Timeline follows Carbotura standard schedule. T0 is engagement authorisation date — not yet confirmed by county authority.
W5Employment and ACM impact metrics use Carbotura standard parameters scaled by TPD. All employment and economic impact figures are estimates.
W6CCWRD biosolids disposal cost not publicly disclosed. Valued at zero in FWDC calculation. Actual avoided cost may be higher.

What This Report Measures

§1.1 — Document Role

This EIR quantifies the fiscal, economic, and structural delta between:

STATE A Current system: all feedstock to Apex at $61.14/ton FWDC (estimated) under Republic Services exclusive franchise. No royalty. No manufactured outputs.

STATE B ACM deployment: 500→1,000→2,000 TPD phased; Beneficiation Fee $100/ton (+2.5%/yr); Circular Royalty™ 120% base (+1pp/yr), 13-month rolling lag. NAICS 325180, 325998, 327992, 331110, 331314, 331492.

Neither state is re-diagnosed here. The Waste Study covers State A diagnosis. The Proposal covers State B transaction structure.

§1.2 — Decision Summary Table

FactorState AState B Yr 1State B Yr 2+
Annual disposal (730k TPY)$44.6M/yr est.$73.0M TMC$74.8M+ escalating
Circular Royalty™ received$0$0 (pre-royalty)$87.6M+ (Year 2)
County capital obligationOngoing disposal franchise cost$0$0
Key data gapsApex current rate (W2); site confirmation (W3); CCWRD biosolids cost (W6)
Cost of delay (Expanded)~$5.5M per month in Year 2+ Circular Royalty™ deferred
ANALYSIS BASIS — STANDARD CSA

This Economic Impact Report models the Delta between State A (current disposal trajectory) and State B (Carbotura CSA).1–§4.1 for full CSA Structure.

§1.3 — Fiscal vs. Regional Economic Separation

Required Separation Statement

Clark County fiscal effects (treasury receipts: avoided disposal and Circular Royalty™) and regional economic effects (FTE employment, economic output, tax base) are distinct categories. They are not combined anywhere in this report.

Current System — Source: Waste Study

§2.1 — Feedstock Volume and Disposition

StreamTPY est.TPDDestinationOperator
Residential MSW~804,000~2,203Apex via Republic transferRepublic Services, Inc.
Commercial / Hospitality MSW~803,000~2,200Apex via franchiseRepublic Services, Inc.
C&D Debris~856,000~2,345Apex + Lincoln County alt.Republic Services / Western Elite
Biosolids (CCWRD)~36,500~100CCWRD internal + permittedClark County Water Reclamation District
Food Waste / Organics~130,000~356Co-mingled to ApexRepublic Services, Inc.
Industrial / Special / Imported~259,150~710Apex + SNHD-permittedVarious
TOTAL~2,593,000 Est~7,105Single destination: Apex (98.5%)Republic Services, Inc.

§2.2 — State A Cost Structure (730k TPY planning basis)

Cost ElementAnnual$/tonSource Type
Disposal — FWDC planning basis$44,632,200$61.14Estimated
Transport (intra-county)~$2.2M-$5.8M$3-8Estimated
Apex actual rateNot disclosedNot disclosedData gap — W2
State A FWDC (730k TPY)$44,632,200/yr$61.14/tonNevada EREF 2024 avg.

§2.3 — State A Cost Trajectory — Three Mechanisms

1. Contractual rate escalation — Republic Services holds sole authority to set and increase Apex tipping fees. No market ceiling exists. 2. Capital reinvestment pressure — Apex compliance obligations (leachate, PFAS, gas capture) create ongoing capex Republic Services has historically cited for rate increases. 3. Absence of competitive alternatives — Apex is the only Class I MSW landfill in Clark County. Market concentration is structural and permanent in the medium term.

§2.4 — State A Environmental and Structural Position

State A generates zero manufactured outputs. Carbon from landfill methane continues unmitigated. PFAS compounds co-disposed without elemental dissociation. Diversion stalled at 20%, 5pp below Nevada's 25% statutory goal. No structural alternative to the Republic Services franchise within county boundaries.

ACM Deployment — Source: Proposal

§3.1 — Inherited Flags

State B is modelled from Proposal-locked parameters. FWDC is estimated (W2). Site is provisional (W3). Timeline is Carbotura standard (W4). All figures are planning-basis projections.

§3.2 — Deployment Configuration

PhaseTPDModulesTPYCOD
Initial5005 modules182,500T0 + 24 months
Medium1,00010 modules365,000T0 + 42 months
Expanded2,00020 modules730,000T0 + 60 months

§3.3 — Economic Terms

ParameterValue
Beneficiation Fee base$100.00/ton (locked)
TMC escalator2.5%/year
Circular Royalty™ base120% of the current-year Beneficiation Fee
Royalty escalator+1 percentage point/year
Payment lag13 months (rolling)
CSA term30 years
Clark County capex$0 — BOO structure

§3.4 — Residual Obligations

At Phase Expanded (2,000 TPD), approximately 1,863,000 TPY (5,105 TPD) continues to flow to State A destinations at prevailing FWDC rates. Phase Expanded addresses 28.1% of the total Clark County system.

§3.5 — Timeline Anchoring

T0 = engagement authorisation. Phase Initial COD = T0+24 months. First Circular Royalty™ = T0+37 months (13 months after Phase Initial COD). Carbotura standard schedule — subject to Term Sheet phase verification confirmation.

§3.6 — Phase Delta Map

State A infrastructure (grey/steel markers) and State B ACM Priority 1 site (emerald square). Right panel shows both states in plain institutional language.

Sources: Wikipedia (Apex, CCWRD); US DOJ/EPA (Sunrise Mountain); Google Places API. March 2026.

Map requires a Google Maps API key.
Set GOOGLE_MAPS_API_KEY in config.js.

Phase Delta — State A vs. State B
State A — Current System
Apex Regional Landfill
Republic Services · 98.5% of Clark County MSW · sole Class I landfill
Republic Services Transfer — N. Las Vegas
315 W Cheyenne Ave · primary MSW consolidation hub
CCWRD Las Vegas WRF
5857 E Flamingo Rd · biosolids origin
Henderson SW Water Reclamation Facility
Henderson · secondary biosolids source
Sunrise Mountain Landfill (Closed 1994)
EPA consent decree 2008 · remediated 2011 · documented historical site
State B — With Carbotura
P1 — ACM Facility · Apex Industrial Corridor
North Las Vegas (US-93/I-15) · 500→2,000 TPD · NAICS 325180, 325998, 327992, 331110, 331314, 331492

Three Components and Quantified Fiscal Position

§4.1 — Three Delta Components

  1. Gross cost displacement: For every ton processed by ACM instead of Apex, Clark County avoids $61.14/ton FWDC. Direct cost avoided — not a revenue receipt.
  2. Circular Royalty™ cash flow: Beginning T0+37 months, Carbotura pays 120% of that year's Beneficiation Fees (13-month rolling lag). Actual revenue receipt to county treasury.
  3. Residual obligation: 71.9% of total stream (5,105 TPD / 1,863,000 TPY) continues to State A at prevailing rates. State B displaces 28.1% of total system.
Pre-Royalty Period — Required Separation

Year 1 and post-Month 13 periods have materially different fiscal characteristics. They must not be combined. Year 1: Beneficiation Fee paid ($73M expanded), $0 royalty. From Month 13: rolling royalty begins. Steady state: royalty exceeds Beneficiation Fee per ton by design.

§4.1 — Phase-by-Phase Comparative Table (Expanded Phase, Annual)

ItemYear 1Year 2Year 5Year 10Year 30
ACM volume (TPY)730,000730,000730,000730,000730,000
State A cost (FWDC×TPY) Est$44.6M$44.6M$44.6M$44.6M$44.6M
Beneficiation Fee paid (State B)$73.0M$74.8M$80.6M$91.2M$152.9M
Circular Royalty™ received$0 (pre-royalty)$87.6M$96.7M$113.8M$220.8M
Gross cost displacement$44.6M avoided$44.6M$44.6M$44.6M$44.6M
Residual cost (State A, 1.86M TPY)$113.9M$113.9M$113.9M$113.9M$113.9M
Clark County capital obligation$0$0$0$0$0

§4.3 — State A vs. State B Comparison Chart

State A vs. State B — Annual Fiscal Comparison · Phase Expanded (730,000 TPY)
State A disposal cost (grey) vs State B: Royalty received (emerald positive) and Beneficiation Fee paid (red negative).
Source: Registry §E/§F locked parameters · FWDC $61.14/ton (Estimated, EREF 2024).

§4.4 — 30-Year Gross Cost Displacement

At $61.14/ton FWDC planning basis, 730,000 TPY generates $44,632,200/year in avoided disposal cost. Over 30 years at constant FWDC: $1,338,966,000 cumulative avoided disposal cost (undiscounted). Note: if actual Apex rate exceeds planning basis, this figure is conservative.

§4.5 — 30-Year Circular Royalty™ Schedule

YearTMC $/tonRoyalty RateRoyalty $/tonAnnual Royalty (730k TPY)
1$100.00$0.00$0
2$102.50120%$120.00$87,600,000
5$110.38123%$125.63$91,709,700
10$124.89128%$133.50$97,455,000
20$163.86138%$172.48$125,910,400
30$209.76148%$302.42$220,766,600

Royalty figures are amounts received. The royalty is paid 13 months in arrears, so the figure shown for a year is earned on the previous year’s delivered tonnage.

§4.6 — Three-Item Gross Fiscal Chart

30-Year Fiscal Flow — Three Gross Items · Phase Expanded (730,000 TPY)
Avoided Disposal Cost (amber, positive) · Beneficiation Fee Paid (red, negative) · Circular Royalty™ Received (emerald, positive Year 2+).
Source: Registry §E/§F · TMC $100/ton · Royalty 120% base +1pp/yr · FWDC $61.14/ton (Estimated, EREF 2024).

Executive Implications — Delta Analysis

  • Year 1 is a cost restructuring, not a new liability: The $73M TMC obligation replaces $44.6M in disposal costs at Apex. The $28.4M premium returns as royalty from Year 2 at 120% of the current-year Beneficiation Fee — the premium pays itself back in 13 months.
  • Gross cost displacement is additive, not duplicative: Avoided disposal cost and Circular Royalty™ together constitute the full county value. Both are presented gross and separately — not netted.

Employment, Environmental, PFAS, and No-Fallback

§5.1 — Employment Delta

Required Separation — Employment

Employment figures represent regional economic effects — not county treasury receipts. Do not add to fiscal royalty figures.

MetricPhase InitialPhase ExpandedBasis
Direct FTE Est+125+500Carbotura standard scaled
Indirect/induced jobs Est+~375+~1,500Carbotura standard multiplier
Annual economic impact Est+$40M++$160M+Carbotura standard scaled

§5.2 — Environmental Delta

All environmental figures are designed-for performance on the basis of Carbotura standard parameters. Actual performance subject to site-specific conditions.

MetricState AState B (Expanded)Delta
Carbon avoidance EstLandfill methane unmitigated7,610-7,830 tCO2e/day avoided~85M tCO2e over 30yr
Water recovery$0435,000 gal/day ultrapure+435,000 gal/day
Material throughput~20% recycling diversion~90% sold globally · ~100% converted (ACM)~+70pp sold-globally
Grid dependencyFull grid dependencyNear-zero external energy drawIsland Mode capable

§5.3 — PFAS Structural Delta

State A: PFAS-containing material (Las Vegas Strip hospitality, food packaging, fire suppression residues) co-disposed at Apex without elemental dissociation. Leachate pathway toward Las Vegas Wash and Lake Mead carries unquantified PFAS loading from decades of co-disposal.

State B: ACM processes at 1,200°C+ in an anoxic, oxygen-free environment — designed for complete PFAS elemental dissociation. Every ton processed by ACM is a ton that does not add to Apex's PFAS burden or leachate pathway. As EPA PFAS regulations tighten, this structural advantage compounds.

§5.4 — No-Fallback Analysis

Clark County has no credible alternative to Apex for large-volume MSW disposal within county boundaries. No new Class I landfill siting process is underway. The nearest alternative (Lincoln County, 2.5 hours) is viable only for C&D haulers absorbing transport cost. State A is not a stable baseline — it is a cost escalation trajectory with no competitive ceiling mechanism.

Risk Register (10 Risks) and Sensitivity Analysis

§6.1 — Structured Risk Register

RiskKey DriverWho Bears ItMitigationResidual
FWDC below planning basisApex rate may be lower than $61.14/ton Nevada averageNeutral to positive — TMC resolves to $100 floor regardless; royalty math unchangedTerm Sheet phase verification rate discovery—
Manufacturing classification challenge (SNHD)SNHD or state attempts solid waste NAICS classificationBoth — Both parties commit to the RPT pathwayManufacturing classification (NAICS 31–33); proactive regulatory pre-engagementHIGH residual — absolute withdrawal trigger
Republic Services franchise constraintExclusive collection rights limit commercial MSW access for Phase Medium+Clark CountyPhase Initial on immediately-accessible streams only; franchise addressed at Phase MediumMEDIUM — Phase Initial fully executable
Phase Initial feedstock shortfallResidential routing barriersCarbotura SPV (throughput guarantee)—LOW
Technology performance below nameplateMCR throughput or recovery ratesCarbotura SPVModular architecture; performance guarantees; phased commissioningLOW per module
Timeline slippage — SNHD permittingManufacturing permitting timeline; site acquisitionSharedThree site candidates; standard schedule includes contingencyMEDIUM — each month defers ~$5.5M royalty
TMC vs. FWDC escalation divergenceFWDC growth rate relative to TMC 2.5%/yr escalationClark CountyFloor/ceiling structure limits TMC range; FWDC sensitivity reviewed in FSMEDIUM
CSA counterparty credit (Carbotura SPV)SPV insolvency over 30-year termClark CountyStep-in rights; performance bonds; project finance covenantsLOW
PFAS regulatory escalation at ApexEPA tightening PFAS standards; Apex compliance cost increasesRepublic Services (State A only)ACM eliminates PFAS burden; no compliance exposure in State BPOSITIVE for State B — regulatory asymmetry
Lake Mead drought / leachate liability escalationSustained low water levels; heightened Apex environmental scrutinyRepublic Services (State A only)ACM eliminates leachate pathway from processed materialPOSITIVE for State B

§6.2 — Feedstock Variability ±20%

ScenarioTPYAnnual TMC Yr 2Annual Royalty Yr 2
Base case730,000$74.8M$87.6M
-20% feedstock584,000$59.8M$70.1M
+20% feedstock876,000$89.8M$105.1M

The model is robust to significant volume variation.

§6.3 — FWDC Sensitivity — Sign-Change Threshold

FWDC affects only the avoided-cost component, not the royalty arithmetic. Sign-change threshold: none in Year 2+.

§6.4 — Royalty Escalator Sensitivity

EscalatorYr 10 Royalty $/tonYr 30 Royalty $/ton
0 pp/yr (flat 120%)$150.00$251.71
+1 pp/yr (base case)$155.96$302.42
+2 pp/yr (upside)$162.04$353.13

§6.5 — Timeline Slippage

ScenarioPhase Initial CODFirst RoyaltyRoyalty Deferred (Expanded)
Base caseT0 + 24 monthsT0 + 37 months
6-month slippageT0 + 30 monthsT0 + 43 months~$43.8M
12-month slippageT0 + 36 monthsT0 + 49 months~$87.6M

Royalty figures are amounts received. The royalty is paid 13 months in arrears, so the figure shown for a year is earned on the previous year’s delivered tonnage.

Binding Constraints, Irreversibility, and Optionality

§7.1 — Binding Constraints

  • ▶Republic Services franchise (1993, amended 2005): Grants sole tipping fee authority and exclusive MSW collection rights to Republic Services. No market ceiling on Apex rate escalation. Every year without an alternative destination is a year of uncontrolled cost growth.
  • ▶SNHD manufacturing classification pathway: The Regulatory Predicate Transition (RPT) requires NAICS 325180, 325998, 327992, 331110, 331314, 331492 classification. SNHD must engage manufacturing — not solid waste — regulatory pathway.
  • ▶Carbotura deployment queue: CSA execution secures Clark County's capital allocation position in Carbotura's regional deployment pipeline.

§7.2 — Decision Window Table

Decision PointRecommended TimingCost of Missing Window
LOI/MOU executionWithin 6 months of initial engagement~$5.5M/month Year 2 royalty deferred (Expanded)
CSA executionT0 + 4-6 monthsDelays COD and first royalty proportionally
SNHD pre-engagement (manufacturing classification)Concurrent with Term Sheet phase verificationPost-COD reclassification is resolved under the RPT pathway
Irreversibility Mechanism

The binding irreversibility mechanism is the 1993 Republic Services franchise agreement — specifically, the sole tipping fee authority clause. Every year this franchise runs without an alternative, Clark County's leverage in any future franchise renegotiation weakens. The ACM facility is the only credible alternative destination for large-volume MSW that Clark County can deploy within the county. Once the next franchise renewal window passes without a demonstrated county alternative, the negotiating gap widens structurally.

§7.4 — Optionality Matrix

OptionCounty CapExRevenueFWDC ControlTimeline
Continue State A (Apex)$0$0 royaltyNone — Republic Services sets ratesOngoing escalation
County-owned WTE/RRF$200M-$500M+Gate fees onlyFull — county-owned8-12 year development
ACM BOO CSA$0$87.6M+ Year 2 royaltyTMC floor/ceiling + royalty offsetT0+24 months Phase Initial
Do nothing$0$0NoneQueue position loss

All Values Traced to Preceding Sections

§8.1 — Fiscal Effects

Fiscal ItemYear 1Year 2Year 30Source
Avoided disposal (730k TPY)$44.6M$44.6M$44.6M§4.4
Beneficiation Fee paid($73.0M)($74.8M)($152.9M)§4.1
Circular Royalty™ received$0$87.6M$220.8M§4.5

§8.2 — Regional Economic Effects

Not county fiscal receipts — regional economic activity generated by ACM operations.

Phase Expanded: +500 direct FTE (est.) · +~1,500 indirect jobs (est.) · +$160M+ annual economic impact (est.) · First manufacturing-classification advanced material processing facility in Nevada.

§8.3 — Environmental Effects

Designed-performance basis. Actual performance subject to site-specific conditions.

~85M tCO2e avoided over 30yr (est.) · 435,000 gal/day ultrapure water recovered · PFAS elemental dissociation on all processed material · ~90% sold globally · ~100% converted · near-zero external energy draw.

§8.4 — Structural Effects

State B establishes Clark County's first credible large-volume MSW alternative to Apex. Even at 28.1% of total stream, an operating ACM facility changes the franchise renegotiation dynamic with Republic Services materially — from no alternative to a demonstrated, operating alternative destination with competitive economics.

§8.5 — Unresolved Data Gaps

GapImpact on AnalysisResolution Path
Apex current contracted tipping rate (W2)FWDC may understate actual avoided cost advantage. Direction: ACM likely stronger than modelled.Term Sheet phase verification — direct rate request
CCWRD biosolids disposal cost (W6)Biosolids valued at zero in FWDC. Actual avoided cost unknown.CCWRD direct engagement
Site P1 land confirmation (W3)P1 provisional — acquisition timeline not modelled.North Las Vegas City planning
2025 Clark County disposal volumesFeedstock estimated from 2021 data.SNHD annual disposal reports
Appendix A

Sources and Methodology

ElementMethod / SourceNote
FWDC derivationNevada statewide 2024 EREF average ($61.14/ton)ESTIMATED
Beneficiation Fee formulaMAX($100, MIN($150, FWDC-$5)) → $100/ton floorUser input locked
Phase sizing500/1,000/2,000 TPD user input; modules = TPD/100User input
Royalty formulaRoyalty(m+13) = TMC(m) × Royalty_Rate(m); 120% Year 1, +1pp/yrCarbotura rule default
Environmental performanceCarbotura standard 400 TPD baseline, scaled by (TPD/400)ESTIMATED — designed for
Employment basis100 FTE per 400 TPD, scaledESTIMATED
Timeline basisCarbotura standard deployment scheduleBASELINE
Appendix B

Glossary Additions

Gross Cost Displacement
Disposal cost avoided by routing feedstock to ACM instead of Apex. FWDC × displaced TPY. Presented separately from Circular Royalty™.
Fiscal Flows, Shown Separately
Avoided Disposal + Circular Royalty™ − Beneficiation Fee paid. Negative in Year 1 (pre-royalty); positive from Year 2 onward at base case.
Pre-Royalty Period
Months 1-12 following first feedstock delivery. Beneficiation Fee paid; $0 royalty received. Structural feature of 13-month rolling lag.
Royalty Ramp Period
Month 13 through approximately Month 24. Rolling royalty payments begin based on prior 13 months' TMC collections.
Steady-State Period
Delta Model
This report's analytical framework. All figures express the difference between State A (current system) and State B (ACM deployment).
State A
Clark County current system: all MSW to Apex at $61.14/ton estimated FWDC. No royalty. No manufactured outputs.
State B
ACM deployment under 30-year CSA. 500→2,000 TPD. TMC $100/ton. Royalty 120% base +1pp/yr, 13-month lag. NAICS 325180, 325998, 327992, 331110, 331314, 331492.
US GAAP
Governing accounting standard for Carbotura SPV and this Clark County engagement's financial reporting.
Regulatory Predicate Transition (RPT)
Carbotura engagement precondition: ACM must receive manufacturing NAICS classification (325180, 325998, 327992, 331110, 331314, 331492). Solid waste classification is resolved under the RPT pathway.
Appendix C

Evidence Chain

FigureValueSourceType
FWDC planning basis$61.14/tonEREF (2025), Analysis of MSW Landfill Tipping Fees 2024ESTIMATED
Total Clark County disposal2,593,185 TPY (2021)NDEP 2021 / UNLV Municipal Waste studyVERIFIED
Beneficiation Fee$100.00/tonUser input — lockedUSER INPUT
Royalty parameters120% / +1pp/yr / 13 monthsCarbotura standardRULE DEFAULT
Clark County recycling rate~20%NDEP 2025 LCB ReportVERIFIED
Apex operator + franchise termsRepublic Services / 1993 franchise / sole fee authorityWikipedia; Las Vegas Review-Journal 2016/2026; Waste DiveVERIFIED
CCWRD operatorClark County Water Reclamation DistrictWikipedia; CCWRD official siteVERIFIED
Sunrise Mountain closureClosed 1994; EPA decree 2008; remediated 2011US DOJ press release Aug 2008; Las Vegas PavingVERIFIED
Was this EIR useful?